ENERGY INFRASTRUCTURE / DECISION SYSTEMS

POWER BEFORE PROMISE.

FusorX turns power constraints into capital decisions, starting with data-center power delivery and expanding into battery and microgrid intelligence.

DARE TO PRESSURE THE ASSUMPTIONS.
01THE DECISION

THE GAP BETWEEN DATA AND CAPITAL

QUEUE DATA TELLS YOU WHAT IS HAPPENING. FUSORX TELLS YOU WHETHER THE SITE STILL WORKS.

The first FusorX module underwrites whether a power-constrained site should wait, bridge, phase, relocate, or stop. The broader product direction extends the same evidence-linked decision logic to storage and microgrid assets.

SEE THE WORKSPACE
02 / PATHWAYS

Four routes.
One capital decision.

Each pathway is modelled against the same commercial boundary, so timing and risk cannot hide inside inconsistent assumptions.

01
51MONTHS
WAIT

Preserve capital.
Accept the clock.

Best when utility certainty is high and delayed revenue does not destroy site value.

PRIMARY RISKLOST CONTRIBUTION
02
11MONTHS
BRIDGE

Buy time with
on-site power.

Temporary or permanent generation is justified only when early revenue survives fuel, permit, and execution downside.

PRIMARY RISKPERMIT + FUEL
03
40INITIAL MW
PHASE

Start smaller.
Scale deliberately.

Energize the first block earlier while preserving optionality for the full grid-served campus.

PRIMARY RISKRAMP MISMATCH
04
×0SUNK CAPITAL
STOP / MOVE

Kill the site
before it kills value.

Relocate or stop when power, permitting, fuel, or economics cannot clear the underwriting threshold.

PRIMARY RISKSUNK-COST BIAS
01 / 04
LIMITED PUBLIC DEMO

Enough to understand it.
Not enough to copy it.

The public sample shows the decision flow and output hierarchy. Detailed assumptions, formulas, evidence trails, sensitivity analysis, and exportable decision memos remain locked for private pilots and commercial users.

FUSORX
RED DEER COMPUTE CAMPUS / CASE FX-027
RECOMMENDED PATHWAY

Phased bridge → grid

ADVANCE
RA NPV$418M+61% vs wait
FIRST POWER11 mo.38 months earlier
CONFIDENCE79%3 open gates
LOAD120 MW40 MW phase 1
RISK-ADJUSTED VALUE$M
PHASEDHYBRIDBRIDGEWAIT
OPEN DILIGENCE GATES
Firm gas capacityHigh severity
01
Air permit scheduleHigh severity
02
Generator deliveryMedium severity
03
OPEN LIMITED DEMO
03 / PRODUCT SYSTEM

ONE COMPANY.
TWO DECISION LAYERS.

FusorX is not presented as a finished suite. The public website separates what works today from what remains in development.

LIVE PUBLIC SAMPLE01

Power & Compute Underwriting

Decision support for data-center and other large-load sites facing delayed, uncertain, or expensive power delivery.

  • Grid wait versus bridge power
  • Phased energization and relocation
  • Risk-adjusted economics and kill conditions
  • Evidence-linked investment review
OPEN THE LIMITED DEMO
PRIVATE ROADMAP02

Battery & Microgrid Intelligence

A planned decision layer for storage performance, dispatch economics, resilience, asset health, and project-level battery or microgrid choices.

  • Battery performance and degradation evidence
  • Dispatch and revenue-stack scenarios
  • Microgrid resilience and operating trade-offs
  • Hardware integrations only where access is permitted
This is not represented as a finished public BMS platform. Access is being developed through scoped pilots and integrations.
REQUEST ROADMAP ACCESS
NPVFIRST POWERDELAY COSTPERMIT RISKFUEL EXPOSUREKILL CONDITIONS NPVFIRST POWERDELAY COSTPERMIT RISKFUEL EXPOSUREKILL CONDITIONS
04 / METHOD

UNCERTAINTY
LEFT VISIBLE.

FusorX does not hide judgment behind a score. It shows where the decision comes from and exactly what can invalidate it.

01FRAME

Set the commercial boundary.

Required date, load, PUE, contribution per MW, grid estimate, hurdle rate, and site constraints.

02MODEL

Compare like with like.

Lead time, capex, power cost, fixed O&M, uptime, emissions, execution confidence, and downside delay.

03PRESSURE

Price delay and failure.

Monthly cash flow, NPV, IRR, payback, lost contribution, probability-weighted downside, and kill conditions.

04DECIDE

Turn analysis into a gate.

Advance, hold, relocate, or stop with an evidence-linked memo suitable for investment review.

05 / TRUST

THE PROTOTYPE
KNOWS ITS LIMITS.

The workspace asks how the browser should handle case data before it loads. Local saving is explicit, session-only use is available, and no analytics or advertising trackers are included in this static beta.

YOUR CASE
LOCALBrowser storage
SESSIONNo persistence
DELETEOne-click wipe
06 / PRIVATE BETA

BRING THE
POWER PROBLEM.

Join the waitlist, request a design-partner conversation, or tell FusorX what decision your team cannot currently underwrite with confidence.

POWER & COMPUTELarge-load siting and power-pathway decisions
BATTERY & MICROGRIDStorage, resilience, and operating intelligence
NO PUBLIC EMAIL REQUIREDYour submission is delivered through the site form

Do not submit confidential, export-controlled, critical-infrastructure security, or other sensitive information through this form.

PRIVATE BETA / 2026

UNDERWRITE
THE POWER.
THEN THE SITE.

Review the limited sample, then use the waitlist form to request a scoped design-partner or commercial conversation.