18.0 MW Reference Facility
Evaluate how electrical power paths, rack placement, and thermal envelopes bound usable server capacity—kept cleanly distinct from facility energy efficiency.
Capacity Summary
Usable server capacity is governed by the first active infrastructure limit. In this 18.0 MW facility, Cooling Zone C4 (13.9 MW) binds ahead of Rack Placement (14.2 MW) and the Power-Path Limit (14.6 MW).
Constraint Envelope (18.0 MW Scale)
| Subsystem / Parameter | Modeled Value | Role in Capacity Envelope |
|---|---|---|
| Facility Power Supply | 18.0 MW | Total site electrical allocation |
| Power-Path Limit | 14.6 MW | Non-binding while cooling remains at 13.9 MW |
| Rack-Placement Limit | 14.2 MW | Non-binding while cooling remains at 13.9 MW |
| Cooling Limit (Cooling Zone C4) | 13.9 MW | Active bottleneck — sets usable server capacity |
| Committed IT Load | 12.1 MW | Existing baseline server demand |
| Available Capacity Now | 1.8 MW | 13.9 MW usable − 12.1 MW committed |
AI Deployment Load Impact
Slide across 0.60 MW to 3.60 MW (in 120 kW rack increments) to compare a planned AI deployment against the 1.80 MW available capacity envelope.
Energy Performance
Facility and IT energy breakdown over a representative 30-day operating window (720 hours).
PUE (Power Usage Effectiveness) measures the ratio of total facility energy to IT equipment energy over the same measurement period. Because PUE tracks energy efficiency rather than physical subsystem limits, it is evaluated separately from spare server capacity (MW).
30-Day Average Power Breakdown (16.21 MW Scale)
| Energy Metric | 30-Day Total (720 h) | Average / Ratio | Operational Context |
|---|---|---|---|
| Total Facility Energy | 11,674 MWh | 16.21 MW | Combined IT, cooling, and distribution demand |
| IT Equipment Energy | 8,712 MWh | 12.10 MW | Aligned with 12.1 MW committed IT load |
| Non-IT Facility Overhead | 2,962 MWh | 4.11 MW | Thermal rejection, electrical losses, and auxiliaries |
| Modeled PUE | 11,674 ÷ 8,712 | 1.34 | Efficiency ratio only — distinct from spare MW headroom |
| Thermal Delta-T | Zone C4 | 11.4 °C | Reference supply-to-return temperature differential |
Reference Model & Decision-Support Boundary
This interactive workspace uses a representative 18.0 MW reference model to illustrate FusorX workflows during private-beta development. FusorX operates strictly as read-only analytical software—it does not send commands to live facility equipment, guarantee energy savings, or substitute for independent review by qualified facility engineers.